PLSED309039EN PM1000 Series Power Meters
08/2010 Chapter 5 – Installation
© 2010 Schneider Electric. All rights reserved.
2-phase 3-wire connection with two CTs
Direct voltage connections for the input voltages L-L up to 480 VAC.
Otherwise, two PTs
Figure 5-6: 2-phase 3-wire connection
NOTE: Make sure 2-phase is programmed in the power meter PROG menu- setup.
Single-phase connection with 1 CT
Direct voltage connections for voltages up to 480 VAC LL. Otherwise, use
one PT.
1. Program the power meter in single-phase mode.
However, voltages primary and secondary need to be programmed as
Line to Line.
2. Connect the voltage and current inputs only to the V1 and A1 voltage
and current terminals of the power meter.
3. The unused current terminals (A2 and A3) must be shorted together to
reduce noise picked up in the power meter.
4. However, the energy parameter readings will be accurate.
Figure 5-7: Single-phase connection
Communication
(PM1200)
0.25A
Aux supply
(Control Power)
44 to 277 VAC/DC
LINE
LOAD
L1 L2 N
PT if VAC LL 481 V
Communication
(PM1200)
0.25 A
Aux supply
(Control Power)
44 to 277 VAC/DC
LINE
LOAD
L1 N
PT if VAC LL 481 V
80 t o 480 Vac LL
VER:03.04.00
D- D -IERS 48 5 - TH M
Op t io n Li st :
RS 485
mA to 6A
50
S
/
N:
COYYWWDXXXX Acc Cl: 1.0
44 to 277 V 50/60 Hz <5 VA