Schneider Electric Modbus Plus Network Bridge Multiplexer none Installationsanleitung Seite 184

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 261
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 183
Connecting a BP85 Bridge Plus
890 USE 100 00
171
7.7 Applying Power
After you have set the address switches to the desired network
addresses, and have connected the network cables, you can apply main
power to the BP85.
AC Power
If you are using AC power, set the power switch on the BP85 rear panel
to the 1 position (power ON).
DC Power
If you are using DC power, switch in on from its external source.
The BP85’s POWER OK indicator should illuminate. When the unit
completes its internal diagnostic tests, the READY indicator should
illuminate.
Seitenansicht 183
1 2 ... 179 180 181 182 183 184 185 186 187 188 189 ... 260 261

Kommentare zu diesen Handbüchern

Keine Kommentare