Schneider Electric Modbus Plus Network Bridge Multiplexer none Installationsanleitung Seite 157

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 261
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 156
Installing the Network Cable
890 USE 100 00
143
5.5 Mounting the Taps
Before mounting each Tap, install the supplied grounding screw and
nut into the Tap as shown in Figure 52.
Before connecting any wiring to a Tap, mount the Tap at a location
near its node device panel. The Tap must be near enough to the node
device to allow the drop cable to reach the node device with a service
loop. See Figure 51 for an example of the drop cable routing.
The location must also be accessible for installing the trunk and drop
cables, and for future maintenance. Figure 52 shows the Tap’s outer
and mounting dimensions.
HOLE
DIAM.
MOUNTING
CENTERS
0.2 in
(5 mm)
3.16 in
(80.2 mm)
4.4 in
(112 mm)
2.2 in
(56 mm)
INSTALL GROUNDING SCREW AND NUT
BEFORE MOUNTING TAP ON PANEL
Figure 52 Tap Layout (Cover Open)
Seitenansicht 156
1 2 ... 152 153 154 155 156 157 158 159 160 161 162 ... 260 261

Kommentare zu diesen Handbüchern

Keine Kommentare