Schneider Electric Altivar 58 VW3-A58101 Bedienungsanleitung Seite 89

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 112
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 88
VVDED397047US R8/01 ALTIVAR
58 Keypad Display
08/01 Chapter 3 Diagnostics and Troubleshooting
© 19982001 Schneider Electric All Rights Reserved
89
Figure 25: DC Bus Measurement Terminals
PROCEDURE 2: CHECKING SUPPLY VOLTAGE
Measure the input line voltage to determine if the voltage is within the
drive controller tolerance.
1. Perform the Bus Voltage Measurement procedure on page 87.
2. Attach meter leads to L1 and L2. Set the voltmeter to the 600 Vac
scale.
3. Reapply power and check for the correct line voltage, shown on the
drive controller nameplate rating.
4. Remove power and repeat the procedure for L2 and L3, and L1 and
L3.
5. When all phases have been measured, remove power. Remove leads
and replace all covers.
+
L1 L2 L3 PA PB U V W
L1 L2 + UVW
L1 L2 L3 PA PB U V W
+
+
+
ATV58D16M2D46M2
ATV58D28N4D79N4
ATV58U09M2U18M2
ATV58U29M2D12M2
ATV58U18N4D23N4
J18-7
J18
Power
Terminal
Blocks
}
}
}
The J18 connector is in the upper left hand corner of the main control
board behind the flexible shield. Use a thin probe to access the
connector pin.
Flexible
Shield
Main Control
Board
Seitenansicht 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 111 112

Kommentare zu diesen Handbüchern

Keine Kommentare